Multi Family Condos

  • Jagare Ridge Townhomes - strip 7 acres, import clay fill, grade site, detail excavate 21 buildings (165 units)
  • Emmanuel Home Inglewood -strip site, bulk excavate 15,000m3 parkade, detail excavate/backfill foundation, place gravel under parkade slab, backfill parkade
  • Creekwood Townhomes - strip site, import clay fill, build 1000 piece lego block retaining wall, detail excavation/backfill, excavate/backfill for mechanical

Road Work

  • 162 Ave Road Rehab - road removals, road core excavation, road and ditch grading 
  • 53 Ave - road removals, road core excavation and grading  
  • Blatchford Removals - Remove 25,000m2 of existing concrete and asphalt airport tarmack

CRU's

  • Secord CRUs - cut/fill site to grade, detail excavate 3 buildings, place radon rock, grade landscape areas
  • Shell Crystallina  - detail excavation of gradebeam, underslab gravel, site grading, clay export
  • 156st Commercial - site grading, detail excavation, install culverts, place radon rock inside buiding

Stockpile Removal

  • Walker Lakes - load, haul, dispose of 30,000m3 of marginal material offsite, level to On-Track dumpsite 
  • Highway 15 - load, haul, and dispose 6,000m3 clay to On-Track dumpsite
  • Schonsee  - strip, load, and haul marginal offsite 6000m3 to On-Track dumpsite